Bugruvatyvske Field, Well 454 (from inactive stock)

In 2012, after a series of works to improve the technology and upgrade the equipment, operations were resumed. In October–November 2012, experimental-industrial tests of the technology and equipment were conducted at three wells of the Bugruvatyvske field (Nos. 454, 79, 334) on the basis of NGDU “Okhtyrkanaftogaz” of PJSC “Ukrnafta.” The obtained results are presented in the graphs.

During the operation at Well No. 454, an increase in liquid production was observed without implementing reservoir hydraulic measures (RHM) or replacing downhole equipment on the neighboring Well No. 57, which produces from the same horizon (from 3 t/day in November 2012 to 3.96 t/day in January 2013) with a rise in dynamic levels from 1222 m to 1001 m.

This indicates that the effect of the wave spreads not only to the near-wellbore zone but also to the reservoir.